Darra to Springfield Transport Corridor Project - Stage 1
- 4.3km of new Centenary Highway
- Railway station at Richlands
- Local road upgrades (2km of local road construction)
- 6 road bridges
- 4 rail bridges
- 4.5km of dual track rail
- 5.6km of pedestrian and cycle path (pedestrian and cycle path from Darra to Logan Motorway interchange).
Major quantities
- 59,000m3 of concrete
- 3,900t of reinforcing steel
- 933t of steel liners
- Earthworks
- cut 615,000m3 - fill 457,000m3
- 148,000t of asphalt
- 7,300m of piles
- 60,000t of cement treated base.
Richlands railway station
Kiss ‘n’ ride for 15 vehicles
Approximately 650 car parks
160m long platform
Bus interchange for four active buses
80 bicycle lockers and 15 bicycle racks
Taxi set down areas
Covered pedestrian areas at station
Diabled access.
|